East Oxford Pit

A proposed sand and gravel pit at 1486 O’Neill Road in North Grenville, supplying the aggregate that builds the region’s roads, schools, hospitals and homes.

Project Overview

Responsible Aggregate Supply for a Growing Region

Tomlinson is proposing a new sand and gravel pit, the East Oxford Pit, on lands identified by the Province and the Municipality of North Grenville as containing high-quality aggregate resources. Existing pits already operate nearby.

The material is suited to road building and to asphalt and concrete production. Extraction would happen in five phases, with each phase rehabilitated as it is completed, while the remaining land continues to be farmed.

44.1ha
Proposed licence area (109 acres)
5
Extraction phases, each rehabilitated in turn
1M
Maximum tonnes a year, set by market demand
Aerial map of the proposed licence boundary at O’Neill Road and Pattersons Corners Road, with County Road 20 to the south

The Site

About the Location

The site is at 1486 O’Neill Road, bordered by County Road 20, Pattersons Corners Road and O’Neill Road. North Grenville’s Official Plan, Zoning By-law and Provincial geological mapping all identify it as containing provincially significant aggregate resources.

The existing wetland on the property is not part of the licensed area, and setbacks will protect it throughout operations.

Project Status

Where the Project Stands

Licensing projects take months to years. Each milestone is updated here as it happens. Last updated [DATE].

    How It Works

    How a Sand & Gravel Pit Works

    A pit is a temporary operation. It follows a controlled sequence that keeps production efficient while protecting neighbours and the environment. Images show other Tomlinson operations.

    Excavator stripping topsoil at a pit

    Site Preparation

    Vegetation and topsoil are removed and stored for rehabilitation. Berms and setbacks go in first to limit noise, dust and visual impact.

    Dragline lifting gravel from below the water table

    Extraction

    Excavators, loaders and dredges remove sand and gravel. Below the water table, material is lifted out without pumping water off site.

    Screening and washing plant

    Processing

    Material is sorted, washed and sized for uses such as concrete and asphalt production.

    Tandem dump truck at a pit

    Transportation

    Aggregate leaves on designated haul routes, with truck traffic managed for safety.

    Rehabilitated pond edge with new plantings

    Progressive Rehabilitation

    As each phase finishes, the land is graded and planted, and natural features such as wetlands and ponds are created.

    Naturalized meadow on a former pit

    Final Land Use

    Once extraction ends, the site becomes a naturalized landscape of ponds, meadows and ecological features suited to its surroundings.

    The Proposal

    How the Pit Would Operate

    Licence

    A Class A licence under the Aggregate Resources Act, for a pit below the water table.

    Phasing

    Five successive extraction phases. Land not being extracted remains in agricultural use.

    Water

    Extraction above and below the water table to roughly 8–13 metres, with no dewatering and no water pumped off site. Groundwater and surface water are monitored every year.

    Volume

    Up to 1,000,000 tonnes a year, based on market demand.

    Truck access

    A new entrance on County Road 20, an existing truck route, heading east toward Highway 416. No truck access from O’Neill Road or Pattersons Corners Road. At peak production, up to 26 trips an hour (13 in, 13 out), not expected every day.

    Hours

    Typically daytime. Limited overnight work for projects such as highway jobs requires a Ministry of Environment permit and is equipment-restricted between 7 p.m. and 7 a.m.

    Blasting

    None planned.

    Extraction phasing plan showing phases 1 to 5 inside the licence boundary, with County Road 20 along the south edge
    Extraction phasing plan, from the ARA Site Plans. Open full size
    Conceptual rehabilitation plan: a naturalized pond surrounded by meadow

    Rehabilitation

    Aggregate Extraction Is a Temporary Land Use

    Rehabilitation happens phase by phase over the life of the pit, as the Aggregate Resources Act requires. When extraction is complete, the site becomes:

    • 18.1 ha of naturalized pond
    • 17.0 ha of cultural meadow along O’Neill Road and Pattersons Corners Road, with potential for future residential development
    • 1.6 ha of sloped areas and 0.6 ha of shoreline around the pond
    • 0.1 ha of new wetland in the northwest corner

    Technical Studies

    Studies & Documents

    Independent consultants completed a study for each topic below as part of the application. Each has a plain-language summary and the full reports to download. The open house display boards are here too.

    Frequently Asked Questions

    Answers to the questions neighbours ask most often. Don’t see yours? Ask the project team.

    Aerial view of a rehabilitated landscape with ponds beside a residential community

    Public Consultation

    Have Your Say

    Applications for Official Plan and Zoning By-law amendments and an Aggregate Resources Act licence were submitted in spring 2026. Neighbours are kept informed through mailed notices, newspaper notices, site signage, open houses and council meetings.

    Next public meeting: [DATE, TIME AND LOCATION]

    Questions About the Application?

    Craig Bellinger, Project Contact

    Tomlinson Group Head Office

    100 Citigate Drive, Ottawa, ON K2J 6K7

    Tel: 613-690-3044

    Who Decides

    The Ministry of Natural Resources decides the licence. The Municipality of North Grenville decides the planning amendments.

    Send the Project Team a Message